Project Description
A3G worked with the First Baptist Church of Lee’s Summit to assist them with renovations and finish selections for multiple areas within their church. In addition to refreshing interior spaces, the project also addressed safety, circulation, and wayfinding.
The largest area of work was completed in the church’s Education building. All three levels were given an update with new finishes. On the lower and main levels, widening the main corridors and creating dedicated check-in stations helped to improve the flow of church goers. A new ramp was constructed from the nursery to add a level of safety and a sheltered vestibule was created to increase security.
Along with the Education building, the Family Life Center was renovated to add a chair lift and secondary exit from the lower level that houses the youth program. All new finishes refreshed the spaces and rounded out the update.